With the global pandemic dying down, more and more infrastructure projects are ramping up across Australia to catch up with lost time during the two years when the country battled to keep COVID-19 at bay.
A significant number of projects have halted works to prevent the spread of the virus, resulting in delays, but now these projects are being fast tracked, aiding in Australia's economic recovery.
To help you catch up with major projects across the country, we have listed projects in different development stages below.
Note: The list only includes projects that we have reported on in the last year and have a project value of at least $100 million and above.
Jump to section
Queensland
Project Name | Description | Value | Status / Stage |
Brisbane Metro | A turn-up-and-go transport system linking the city to the suburbs | $1.2 billion | Major construction begins in 2022 |
Bruce Highway Upgrade - Cooroy to Curra Section D | Delivers a 26km, 4-lane divided highway from the existing interchange at Woondum to Curra | $1 billion | Under construction |
Rockhampton Ring Road | A new 14.7km ring road linking the Bruce Highway through Rockhampton | $1.065 billion | Detailed design stage |
Coomera Connector Stage 1 | Construction of additional crossings of the Coomera and Nerang rivers | $2.16 billion | Early works underway |
Pacific Motorway M1 - Varsity Lakes to Tugun | Widening 10km of the M1 from 2 lanes to a minimum of 3 lanes in each direction | $1 billion | Under construction |
Cross River Rail | A new 10.2km rail line from Dutton Park to Bowen Hills, including a 5.9km twin tunnels under the Brisbane River and CBD | $5.2 billion | Under construction |
Inland Rail - QLD sections | Part of the 1,700km freight rail line connecting Melbourne to Brisbane via regional VIC, NSW and QLD | Approx $4.35 billion | Contract awarded |
Gold Coast Light Rail Stage 3 | Delivers a 6.7km extension south of the existing tram network, linking Helensvale and Burleigh Heads | $1.2 billion | Major construction begins in 2022 |
CopperString 2.0 transmission line project | Delivers a 1,100-km transmission line connecting the North West Minerals Province to the NEM | $1.7 billion | EIS under evaluation by Coordinator-General |
MacIntyre Wind Farm Precinct | A 1,026MW Wind Farm Precinct comprised of Karara and MacIntyre wind farms | $1.96 billion | Major construction begins in 2022 |
Dexus' Waterfront Brisbane project | Redevelopment of the waterfront precinct at Eagle Street Pier and Waterfront Place | $2.1 billion | Major construction begin in 2022 |
Mirvac's 200 Turbot Street project | Redevelopment of the former University of Queensland Dental School into a premium office development | $670 million | Planning |
The Star Gold Coast Tower 2 | A 63-storey mixed-use tower as part of the masterplanned The Star Gold Coast development on Broadbeach Island | $400 million | Under construction |
Gladstone High Purity Alumina Plant | A new facility for the production of high purity alumina | $300 million | Under construction |
Rookwood Weir | Construction of a 16-metre-high weir on the Fitzroy River near Rockhampton | $367.2 million | Under construction |
Kaban Wind Farm | Delivery of a 157MW wind farm and transmission line upgrades | $373 million | Under construction |
Tiaro Bypass | A new four-lane road to address several issues on the Bruce Highway east of Tiaro | $336 million | Planning & Detailed design |
Kidston Pumped Storage Hydro (K2-Hydro) project | A new pumped-hydro storage facility built as part of the Kidston Clean Energy Hub | $777 million | Under construction |
Townsville Ring Road Stage 5 | Duplicating the ring road between Vickers Bridge and Shaw Road and construction of new bridges | $230 million | Under construction |
Olive Downs Coal Project | Development of the Olive Downs Coking Coal Mine and associated facilities and infrastructure | $1 billion | Under construction |
Mooloolah River Interchange Upgrade | Delivery of key safety improvements to the interchange | $320 million | Detailed design |
Aldoga Solar Farm | A two-stage solar farm development with a total capacity of 600MW | $550 million | Early works projected to begin in 2022 |
Winchester South Project | Includes the construction of a new open-cut coal mine, processing plant and rail loop | $1 billion | EIS process underway |
Queensland Train Manufacturing Program | Deliver new trains, a manufacturing facility and other rail infrastructures | $7.1 billion | Procurement |
Saint Elmo Mine | Development of a new vanadium mine within the North West Minerals Province | $250 million | Major construction expected in 2022 |
Beerburrum to Nambour Rail Upgrade (B2N) Stage 1 | Progressive upgrade of the North Coast Line | $550.8 million | Early works underway |
Yeerongpilly Green Riverside Project | Development of a new community to help address land supply challenges | $850 million | Construction underway on Stage 1 |
Haughton Pipeline Project Stage 2 | Construction of a 28.5km water pipeline to extend and connect with Stage 1 pipeline | $274 million | Procurement |
Cairns Western Arterial Duplication Project | Delivery of additional lanes on the last remaining single-lane sections of the highway | $300 million | Major construction expected in late 2022 |
Cairns Ring Road | Deliver upgrades along the Captain Cook Highway, from the Cairns CBD to Smithfield | $359 million | Planning |
Oceania Biofuels' Gladstone refinery | Development of a renewable diesel and sustainable aviation fuel biorefinery | $500 million | Awaiting approvals |
H2-Hub Gladstone Project | A new chemical complex that will produce green hydrogen and green ammonia | Estimated $4.7 billion | Awaiting approval |
Sunshine Coast heavy rail | A proposed 37km passenger rail line that branches out to the east from Beerwah to Caloundra and Maroochydore | Estimated $3.2 billion | Proposed |
Hells Gates Dam | Building a new dam to help improve water security | Estimated $5.4 billion | Final Business Case due in June 2022 |
Urannah Dam | Will include a 200km pipeline to help unlock 103-gigalitres of water for irrigated agriculture | Estimated $2.9 billion | Awaiting further funding |
Gold Coast faster rail development | A new transport infrastructure that will deliver faster and more frequent rail services between Brisbane, Logan, Beenleigh and the Gold Coast | Estimated $2.598 billion | Pre-construction |
New South Wales
Project Name | Description | Value | Status / Stage |
Maxwell Underground Coal Project | Development of a new underground coal mine east-southeast of Denman and south-southwest of Muswellbrook | $509 million | Under development |
Western Harbour Tunnel and Beaches Link Project | Delivery of a second road tunnel under Sydney Harbour to connect the WestConnex Rozelle Interchange with the Warringah Freeway in North Sydney | Total cost undisclosed; NSW Government contibuted $6.3 billion from 2021-22 State Budget | Major construction to begin in 2022 |
Singleton Bypass | Construction of a new bypass road on the New England Highway at Singleton | $700 million | Early works; pre-construction |
M12 Motorway Project | Delivery of a new motorway that will provide direct connection to the Western Sydney Airport, new bridges and an interchange at the M7 Motorway | $2 billion |
Major construction to begin in 2022 |
Sydney Metro - Western Sydney Airport | Construction of a new metro rail line the will connect communities to the new Western Sydney International Airport | $5.25 billion | Under construction |
Sydney Metro City & Southwest | Extending the Metro from the north west, under the Sydney Harbour and all the way beyond the south west | Between $11.5 and $12.5 billion | Under construction |
Sydney Metro West | Delivery of a new underground railway connecting to Greater Parramatta and the Sydney CBD | Final project cost undisclosed; estimated in the billions | Procurement and early works underway |
Culcairn Solar Farm | Development of a 350MW solar farm along with a 100MW battery storage system | $636 million | Approved for development |
Barton Highway Duplication Project | Duplicating the Barton Highway to improve safety for all road users in the southern region | $200 million | Under construction |
Snowy 2.0 | Expansion of the existing Snowy Scheme to deliver | Approx $6 billion | Under construction |
Parkes Bypass | Construction of a new 10.5km highway west of Parkes along the Newell Highway | $187.2 million | Under construction |
New England Solar Farm | Construction of a 720MW solar farm along with a 50MW battery storage system and a substation | $768 million | Under construction |
The YARDS precinct | Development of a new industrial precinct within the Western Sydney Aerotropolis development area | $1 billion | Under construction |
Nelligen Bridge Replacement Project | Construction of a new crossing over the Clyde River to replace the existing bridge along with delivery of a shared user path, landscaping and intersection upgrades | $148 million | Under construction |
Rozelle Interchange Project | The missing link in the WestConnex development which will provide connections to the City West Link and the Western Harbour Tunnel | $3.9 billion | Under construction |
M6 Stage 1 Project | Construction of an underground link between President Avenue, Kogarah and the M8 along with mainline tunnels, ramps and shared paths | $2.5 billion | Under construction |
Project EnergyConnect NSW section | Delivery of a new 900km transmission line that runs between Robertstown in SA and Wagga Wagga in NSW | Total project value at $2.3 billion; Transgrid (NSW) investment at $1.834 billion | Under construction |
Western Sydney International (Nancy-Bird Walton) Airport | Construction of a new airport at Badgerys Creek in Western Sydney | $5.3 billion | Under construction |
Great Western Highway Upgrade Program - Katoomba to Lithgow | Duplication of this section of road to help improve connections between Central West NSW and Sydney as well as reduce congestion | $4.5 billion | Major construction to begin in 2022 |
Bradfield City Centre | Construction of a new CBD within the Western Sydney Aerotropolis, set to become Australia's first 22nd century city | $1.15 billion for the first stage | Under construction |
Macquarie Park Data Centre Project | Development of a new data centre that will support the growing digital economy | $264 million | Under construction |
Parramatta Light Rail | Delivery of a new light rail that will initially connect Westmead to Carlington, and ultimately connect the Parramatta CBD to Sydney Olympic Park | $2.4 billion for Stage 1; $50 million for planning and development of Stage 2 | Under construction |
Nelson Bay Road Upgrade | Upgrading of the road between Williamtown and Bobs Farm with a new off-line route from Bobs Farm to Cabbage Tree Road roundabout | $275 million | Under construction |
Port Botany Rail Line Duplication and Cabramatta Loop Project | Duplicating the remaining 2.9km section of single track between Mascot and Botany, and delivery of a 1.65km rail loop | $400 million | Under construction |
Rye Park Wind Farm | A new 396MW wind farm consisting of about 66 turbines | Approx $700 million | Under construction |
Port Kembla Power Station Project | Construction of a new power station that can produce about 635MW of electricity on demand | $1.3 billion | Awaiting approvals; early procurement |
Newcastle Inner City Bypass | Construction of a 3.4km four-lane divided road between Rankin Park and Jesmond | $450 million | Major construction to begin in 2022 |
M1 Pacific Motorway Extension to Raymond Terrace | Extending the M1 Pacific Motorway towards Raymond Terrace to help improve connection to the Pacific Highway | $2 billion | Procurement |
Warringah Freeway Upgrade | Upgrading the freeway between High Street and Willoughby Road, deliver connections to the future Western Harbour Tunnel and Beaches Link, and improvements to interchanges | Approx $1.2 billion | Under construction |
Coffs Harbour Bypass | A four-lane divided motorway running from Englands Road in the south and linking to an upgraded Sapphire to Woolgoolga section of the Pacific Motorway in the north | Approx $2.2 billion | Planning |
John Hunter Health and Innovation Precinct Redevelopment | Redevelopment of the John Hunter and John Hunter Children's hospitals, expanding the facilities to provide better health care | $835 million | Planning |
Prospect Highway Upgrade | Upgrading the highway to a four-lane divided road, duplication of bridges, upgrading of existing shared path and other associated works | $280 million | Under construction |
New Dungowan Dam and Pipeline Project | Construction of a new dam wall, decommissioning of the existing dam and construction of a 55km large diameter pipeline between the dam and Calala Water Treatment Plant | Approx $1.28 billion | Finalisation of Business Case and awaiting approvals |
Hunter Power Project | Delivery of a 660MW power generation plant consisting of two heavy-duty F-class gas turbine generators and related axillaries | $600 million | Under construction |
Muswellbrook Bypass Project | Construction of the New England Highway bypass of Muswellbrook to help improve freight efficiency, safety and travel times along this route | Estimated $336 million | Awaiting final design and construction |
Moorebank Interstate Intermodal Terminal | The first of four modern interconnected terminals that will service new modern 1,800-metre trains and will feature warehousing and freight management facilities | Approx $514 million | Under construction |
New Dubbo Bridge | Building a new bridge over the Macquarie River in Dubbo, new and upgraded intersections and realignment of the Newell Highway | $220 million | Procurement |
Pacific Highway upgrade through Wyong town centre | Construction of new lanes in each direction between Johnson Road and Culter Drive along with the replacement of the Wyong River road bridge with two new road bridges | $420 million | Planning |
Mulgoa Road Upgrade between Glenmore Parkway and Union Road | A planned upgrade to widen Mulgoa Road between Glenmore Park to Jeanette Street and Blaikie Road to Union Road | Estimated $465 million | Planning |
Victoria
Project Name | Description | Value | Status / Stage |
Murray Basin Freight Rail Network | Delivery of works to improve freight rail movement in the Murray Basin | $689 million | Under construction |
Hurstbridge Line Duplication | Duplicate tracks at several areas along the line and construction of new stations | Part of an $18 billion investment in transport works in the north east | Under construction |
Mirvac Group's LIV Aston project | A new mixed-use precinct with commercial spaces and residential units located at 7 Spencer Street on Melbourne's Northbank | $1 billion | Under construction |
South Geelong to Waurn Ponds Duplication Stage 2 | Duplication of about 8km of tracks, station re-builds, level crossing removals and delivery of new shared user paths | Part of a $1 billion investment in a staged upgrade of the Geelong Line | Major construction to begin in 2022 |
North East Link | Victoria's largest road project, which includes the State's longest road tunnels, to fix the missing link in the region's freeway network | $15.75 billion | Procurement and early works underway |
Melbourne Airport Rail Project | Construction of a new rail line that will connect Melbourne Airport to the rest of the State's regional and metropolitan train network | Estimated between $8 and $13 billion; $10 billion commitment from Australian and VIC Govts | Procurement and early works underway |
Gippsland Line Upgrade | Construction of a new rail bridge over the Avon River, second platforms and station amenities, track duplication, level crossing upgrades extension of the Morwell crossing loop | Approx $435 million | Under construction |
Princes Highway East Stage 3 Project | Construction of the remaining section of the 43km highway between Traralgon and Sale | $253.3 million | Under construction |
Fishermans Bend Innovation Precinct | Redevelopment of the General Motors Holden site, installation of vital infrastructure and services, and a new road linking Salmon Street and Todd Road | $179.4 million for Stage 1 | Planning |
Pound Road West Upgrade | Construction of a new bridge over the Cranbourne rail line, extra lanes between Abbotts Road and South Gippsland Highway, installation of traffic lights, new shared paths and other upgrades | Project cost undisclosed; funded as part of the $2.27 billion Suburban Roads Upgrade - South Eastern and Northern Roads | Under construction |
Suburban Rail Loop | Construction of a 90km orbital rail line that provides a direct link to Melbourne Airport with three transport super hubs at Clayton, Broadmeadows and Sunshine | Estimate between $30 to $34.5 billion for SRL East | Pre-construction; Initial and early works to begin in 2022 |
Marvel Stadium Upgrade | Redevelopment of the stadium precinct, providing new open spaces, function rooms, a renovated public food and beverage area and state-of-the-art change rooms for athletes | $225 million | Under construction |
Camms Road Level Crossing Removal Project | Replacing the dangerous and congested level crossing on Camms Road with a road bridge | Part of the $1 billion investment to duplicate the Cranbourne Line | Early works to begin in 2022 |
130 Little Collins Street Development | Construction of a new building within Melbourne's East End, anticipated to become the largest strata office projects since the beginning of the global pandemic | $190 million | Under construction |
Geelong Fast Rail | Delivery of faster train services between Geelong and the Melbourne CBD | Approx $4 billion | Procurement |
Bendigo and Echuca Line Upgrade | Upgrading of tracks to enable trains to travel faster along the line and construction of new stations | $176.2 million | Under construction |
Shepparton Line Upgrade Stage 3 | Delivery of signalling upgrades between Seymour and Shepparton, expanding train stabling, and track upgrades | $400 million | Under construction |
Kardinia Park Stadium Redevelopment | Redeveloping the stadium to have a two-tier northern stand with a capacity of 14,000, increasing the total capacity to over 40,000 people | $142 million | Under construction |
Port Rail Transformation Project | Development of new rail infrastructure at the Port of Melbourne and a new rail terminal interfacing with the Swanson Dock East Container Terminal | $125 million | Under construction |
Barwon Heads Road Upgrade | Duplication of the road between Settlement Road and Reserve Road, a new bridge over rail at Marshall, intersection upgrades and installation of traffic lights | Approx $365 million | Under construction |
Warrnambool Line Upgrade | Upgrading the line to enable a fifth weekday return service between Warrnambool and Melbourne | Approx $251.8 million | Under construction |
Bridge Inn Road Upgrade | Construction of extra lanes in each direction, installation of traffic lights and safety barriers, construction of a new bridge over Plenty Road, and intersection upgrades | Project cost undisclosed; funded as part of the $2.27 billion Suburban Roads Upgrade - South Eastern and Northern Roads | Major construction to begin in 2022 |
Melbourne Arts Precinct Transformation Project | A two-phased redevelopment of the precinct to transform it into a modern, vibrant arts precinct | $1.7 billion | Procurement and early works underway |
New Generation Trams Project | Delivery of 100 new and accessible trams and construction of a new purpose-built tram depot and maintenance facility | $1.85 billion | Consultation phase |
Hanhwa Armoured Vehicle Centre of Excellence | Construction of a new facility that will manufacture self-propelled howlitzers | $170 million | Major construction to begin in 2022 |
Healesville-Koo Wee Rup Road Upgrade | Construction of extra lanes between Princes Highway and Manks Road, from Princes Highway to Soldiers Road and from Soldiers Road to Manks Road | Project cost undisclosed; funded as part of the $2.27 billion Suburban Roads Upgrade - South Eastern and Northern Roads | Early works underway |
Sunbury Road Upgrade | Construction of additional lanes in each direction between Powlett Street and Bulla-Diggers Rest Road, installation of traffic lights, upgrading of an existing bridge and building a new bridge, construction of new walking and cycling paths and installation of safety barriers | Project cost undisclosed; funded as part of the $2.27 billion Suburban Roads Upgrade - South Eastern and Northern Roads | Under construction |
Western Port Highway Upgrade | Replacing the roundabouts at Ballarto ROad and Cranbourne-Frankston Road intersections with traffic lights | $115 million | Under construction |
Geelong Convention and Exhibition Centre | Delivery of a luxury hotel and commercial spaces, and a 1,000-seat plenary venue | $294 million | Early works underway |
Mt Derrimut Road Level Crossing Removal Project | Construction of a new 1.2km elevated rail bridge over Mt Derrimut Road to replace the level crossing and a new Deer Park Station | $234 million | Early works underway |
Western Australia
Project Name | Description | Value | Status / Stage |
Karratha Urea Plant | Construction of a new processing plant to produce urea | $4.3 billion | Under construction |
Waitsia Gas Project Stage 2 | Construction of a 250 TJ/day gas processing plant in the northern Perth Basin | $768 million | Under construction |
Great Eastern Highway Bypass Interchanges Project | Construction of two new interchanges along the bypass and other associated road works | $386.5 million | Under construction |
Smart Freeway - Mitchell Southbound | Delivery of major upgrades to the Mitchell Freeway southbound including the roll out of Smart Freeways and upgrades to shared paths | $140 million | Under construction |
Subi East Precinct Development | Delivery of diverse housing across the precinct as well as a new inner-city high school and quality recreation and community spaces | $227 million | Under construction |
Coburn Mineral Sands Project | Development of a world-scale mineral sands deposit, including associated infrastructure | $338 million | Under construction |
Spoilbank Marina | Delivery of several port amenities and public spaces to transform the waterfront at Port Hedland | $121.5 million | Under construction |
Leach Highway and Welshpool Road Interchange Upgrade | Construction of a new bridge on Leach Highway over Welshpool Road, new roundabout at the current intersection and new shared user paths | $136 million | Under construction |
METRONET: Armadale Line Level Crossing Removal Project | Removal of several dangerous and congested level crossings along the Armadale Line and replacing it with elevated rail along with the construction of new elevated stations | Approx $415 million (2020) | Design stage; further consultation in 2022 |
Lake Disappointment Brine and Sulphate of Potash Project | Development of a new facility to produce sulphate of potash from mining and brine evaporation | $450 million | Granted Major Project Status |
Swan River Crossings Project | Construction of new rail and road bridges between the existing Fremantle Traffic Bridge and current rail bridge | $230 million | Planning; Major construction to begin in 2022 |
Mount Holland Lithium Project | Development of a new lithium mine and concentrator as well as a refinery in Kwinana | Approx $1.9 billion | Under construction |
Albany Ring Road | Construction of an 11km road to help improve efficiency and congestion in the region | $175 million | Under construction |
METRONET: Midland Station | Construction of the new Midland Station to the east of the existing station and associated infrastructure and amenities | $315 million | Early works |
H2Perth Hydrogen and Ammonia Facility | Development of a new facility that can produce low cost, low carbon hydrogen-based energy | $1 billion | Planning |
METRONET: High Capacity Signalling Project | Replacement of existing signalling and control systems with an Integrated Communications-Based Train Control System | $500 million | Procurement |
METRONET: Armadale Line Transformation | Includes the Byford Rail Extension, Victoria Park-Canning Level Crossing Removal and Thornlie-Cockburn Link | Approx $2 billion | Pre-construction and early works |
Scarborough and Pluto Train 2 Project | Development of the Scarborough resource with new offshore facilities connected by a 430km pipeline to a second LNG train at the existing Pluto LNG facility as well as construction of a new domestic gas facility | Estimated $16 billion | Major construction expected in 2022 |
Stephenson Avenue Extension | Construction of a new connection from Cedric Street to Scarborough Beach Road with new grade-separated interchange and new links to Ellen Stirling Boulevard | $165 million | Under construction |
Kalgoorlie Rare Earths Processing Facility | Development of a new facility that will process rare earth concentrate from Lynas' Weld mine | $500 million | Under construction |
Mardie Salt & Potash Project | Delivery of a 100km2 evaporation pond and crystalliser system, two processing plants and new export facility | Estimated $913 million | Under construction |
Thunderbird Mineral Sands Project | A two-stage development of a wet concentrate plant in the Kimberley region | Estimated $300-$320 million | Major construction to begin in 2022 |
South Australia
Project Name | Description | Value | Status / Stage |
Goyder South Stage 1 Wind Farm | Delivery of a 412MW wind farm as part of the broader Goyder Renewables Zone | Funded as part of $3 billion investment for Goyder Renewables Zone | Under construction |
Torrens to Darlington Project | Deliver of the final 10.5km section of the North-South Corridor, a 78km non-stop motorway between Gawler and Old Noarlunga | $9.9 billion | Early works stage |
Ovingham Level Crossing Removal Project | Removal of the level crossing and raising Torrens Road over the existing Ovingham level crossing | $196 million | Under construction |
Eyre Peninsula Link | Construction of a new double-circuit 132kV transmission line from Cultana to Port Lincoln | Approx $300 million | Under construction |
Project EnergyConnect SA section | Delivery of a new 900km transmission line that runs between Robertstown in SA and Wagga Wagga in NSW | Total project value at $2.3 billion; ElectraNet (SA) investment at $457.4 million | Under construction |
Prominent Hill Mine Expansion | Construction of a new hoist shaft to enable access to Mineral Resources outside the existing trucking mine plan at Prominent Hill | $600 million | Under construction |
Fleurieu Connections Package | Duplication of Main South Road and Victor Harbor Road | $560 million | Under construction |
Truro Bypass | Proposed alignment of the bypass will divert the Sturt Highway to just north of the town and across Accommodation Hill | $202 million | Detailed design phase |
Port Pirie Green Hydrogen Project | Development of a manufacturing plant with a production capacity of 100 tonnes per day of green hydrogen | $750 million | Awaiting Final Investment Decision |
Central Market Arcade Redevelopment | Expanding the Adelaide Central Market to feature new retail spaces and a 7-level A-grade commercial office tower | $400 million | Major construction to begin in 2022 |
Augusta Highway Duplication Project | Construction of additional lanes starting just north of the new Copper Coast Overpass to Lochiel | $260 million | Under construction |
Northern Territory
Project Name | Description | Value | Status / Stage |
Australia-ASEAN Power Link (AAPL) | Development of renewable energy sources and a 4,500km transmission line linking Darwin, Singapore and ASEAN markets | $22 billion | Proposed; Awaiting Final Investment Decision |
Desert Bloom Hydrogen Project | Staged development of a commercial-scale green hydrogen operation producing up to 410,000 tonnes of hydrogen annually | Approx $15 billion | Proposed; Planning |
New Fuel Storage Facility in Darwin | Construction of a new fuel storage facility with a capacity of up to 300 million litres of fuel | $270 million | Under construction |
Darwin Ship Lift Project | Delivery of a new ship lift facility featuring a 26-metre-wide, 103-metre-long and 6-metre-deep ship lift | Estimated $400 million | Major construction to begin in 2022 |
Tasmania
Project Name | Description | Value | Status / Stage |
East and West Tamar Highway Upgrade | Targeted upgrades to both sides of the Tamar Highway, including grade separation, junction upgrades, overtaking lanes and integration of the new Tamar River Bridge | $100 million | Consultation phase |
New Bridgewater Bridge | Delivery of a new standalone four-lane bridge downstream the existing river crossing, enhanced interchanges, and a new shared path | $786 million | Major construction to begin in 2022 |
Australian Capital Territory
Project Name | Description | Value | Status / Stage |
Light Rail Stage 2A | Delivery of an additional 1.7km track with three stops south of the existing line to bring light rail to Woden | $132.5 million | Major construction to begin in 2022 |
Commonwealth Avenue Bridge Upgrade | Upgrading the bride to strengthen the structure and widen the existing road | $137 million | Construction pipeline TBA |