Massive West Gate Tunnel Project in VIC reaches new milestone

Monica Gameng   |   May 16, 2022
Artist impression of a widened West Gate Freeway (cr: Victoria's Big Build)

Four years since major construction commenced, the massive West Gate Tunnel Project in Victoria is progressing well and has marked another major milestone with the second tunnel boring machine (TBM) now in the ground. 

TBM Vida will take 12 months to complete her journey digging the 2.8-kilometre inbound tunnel that will meet up with the West Gate Freeway just west of Williamstown Road. 

On the other hand, TBM Bella commenced work on the 4-kilometre outbound tunnel in March. 

west-gate-tunnel-mapProject map (source: Victoria's Big Build)

The two TBMs are considered the largest in the Southern Hemisphere with each measuring 15.6 metres in diameter, 90 metres in length and about 4,000 tonnes in weight – comparable to about 20 Boeing 747 airplanes. 

The TBMs are equipped with state-of-the-art computerised navigation systems, enabling them to dig an average of 9 metres a day deep underground with little to no disturbance above the ground. 

A highly trained specialist crew will be piloting the TBMs around the clock while the twin tunnels are being built. 

A statement from Victoria’s Big Build said: “The best local and international talent have been recruited to build the West Gate Tunnels, including a diverse team of experts in hydraulics, mechanical engineering, tunnelling systems and electrical.” 

The approximately $10 billion West Gate Tunnel Project will deliver: 

  • A widened West Gate Freeway with additional express lanes between the M80 and the West Gate Bridge 
  • A tunnel from the West Gate Freeway that will take cars and trucks underground and off residential streets in the inner west 
  • A bridge over the Maribyrnong River, linking to an elevated road along Footscray Road, will get people where they need to go in the city’s north, and ramps will give trucks direct access to the port 
  • Over 14 kilometres of new and upgraded walking and cycling paths, creating almost 9 hectares of new parks, and landscaping existing open space 

figure_col12_lgArtist impression of new bridge over Maribyrnong River (source: Victoria's Big Build)

The West Gate Tunnel Project is one of three interrelated projects, including the Monash Freeway Upgrade and Webb Dock access improvements – both completed in 2018. 

The project is due to be completed in 2025 and it will provide a vital alternative route to the West Gate Bridge with a much-needed second river crossing that will make journeys quicker and safer as well as remove thousands of trucks from residential streets. 

This massive road transport infrastructure is being delivered through a partnership between the Victorian Government and Transurban, and is being built by the CPB Contractors and John Holland Joint Venture (CPBJH JV). 

The construction of the West Gate Tunnel Project is expected to create 6,000 jobs across Victoria, including more than 500 opportunities for apprentices, trainees and cadets.

Source: Victoria’s Big Build – West Gate Tunnel Project (1, 2, 3

New call-to-action

Monica Gameng
As Felix's Marketing Assistant since 2015, Monica is responsible for researching and sharing new and progressing projects within the construction and mining sectors in Australia. It's no surprise that Monica has her finger on the pulse of Australian major projects given she has produced more than 1,000 posts. She truly is an industry expert.
Follow me:

Related Articles

Projects, VIC
Massive West Gate Tunnel Project reaches new major milestone

Victoria’s West Gate Tunnel Project has reached a major milestone with the completion of tunnelling works on the twin tunnels. This takes the massive project a step closer to relieving congestion on the West Gate Bridge. 

Projects, VIC
Tunnelling works commence on North East Link tunnels

The North East Link Project in Victoria has reached another major milestone with the beginning of tunnelling works on the State’s longest road tunnels. 

Projects, VIC
Tunnelling works set to begin on North East Link twin tunnels

The jointly funded North East Link development in Victoria is a step closer to providing improved travel times and removing trucks off local roads as it reaches another construction milestone. 

Get the latest project news

Formerly known as the PlantMiner blog, Felix Project News is Australia's top 10 Construction blog. Join thousands of construction and mining pros getting the best content right in their inbox.
  • updates on Australia's pipeline of state and federal projects
  • fresh contract awards from major contractors and builders

If you're looking to contact us about other matters, please contact us.